Factors Affecting Cost
- Material Costs: The price of concrete and other materials needed for poured wall construction.
- Labor Costs: Wages for skilled laborers and contractors in Bloomington, IN.
- Site Preparation: Expenses related to preparing the site, such as excavation and grading.
- Wall Thickness and Height: Costs vary depending on the thickness and height of the walls.
- Reinforcement Requirements: Additional costs for steel reinforcements to ensure structural integrity.
- Weather Conditions: Potential delays and additional costs due to weather-related challenges.
- Access to Site: Difficulty in accessing the construction site can increase costs.
- Permits and Inspections: Fees for obtaining necessary permits and passing inspections.
Common Tasks and Costs
Task | Average Cost (Bloomington, IN) |
---|---|
Excavation and Site Prep | $1,000 - $3,000 |
Concrete Material | $100 - $150 per cubic yard |
Labor for Poured Walls | $50 - $75 per hour |
Reinforcement (Steel Rebar) | $0.75 - $1.25 per linear foot |
Formwork Installation | $2.50 - $4.00 per square foot |
Wall Finishing | $1.50 - $3.00 per square foot |
Inspections and Permits | $500 - $1,000 |